Kerb replacement
Set PSL on existing tarmac and adjust the stringline height. A suitable ballasted arrangement allows positioning without penetrating the surface.
PSL supports a variety of setting-out arrangements, with kerbing at its core. Choose the support arrangement to suit the alignment, surface and project requirements.

Position and adjust the stringline through the pigtail bolt, then retrieve the supports for the next set-out.
Discuss your kerb lineSet PSL on existing tarmac and adjust the stringline height. A suitable ballasted arrangement allows positioning without penetrating the surface.
Fine adjustment in line and level helps establish a straight reference along the kerb run. Line tension and support spacing must suit the span and required tolerance.
Set supports to follow a specified 90-degree corner, with each leg aligned to the project’s setting-out control.
Arrange supports at intervals appropriate to the specified radius. Support spacing, stability and stringline tension must suit the curve; a stringline forms chords between supports.
PSL’s proposed methods cover sub-base, existing tarmac, CBGM and bridge decks. Where shallow services or waterproofing are present, do not use penetrating fixings. Surface suitability, ballast and anchor arrangements must be established for the site.
View the installation overview ↗Leave driven setting-out pins behind. Put Perfect String Line to work on your next kerb line.